Operations view does not include revised/revized costs

Posts about the simPRO API. Help/support/how-to etc.
Forum rules
  • Check the documentation first. Before posting questions, please check the documentation to ensure it doesn't already cover what you need.
  • No spam. All automated messages, advertisements, and links to competitor websites will be deleted immediately.
  • Post in relevant sub-forums only. Messages posted in the wrong topic area will be removed and placed in the correct sub-forum by moderators.
  • Respect other users. No flaming or abusing fellow forum members. Users who continue to post inflammatory, abusive comments will be deleted from the forum after two warnings are issued by moderators.
  • Harassment. No threats or harassment of other users will be tolerated. Any instance of threatening or harassing behavior is grounds for deletion from the forums.
  • Adult content. No profanity or pornography is allowed. Posts containing adult material will be deleted.
  • Bandwidth. All images and signatures must be 500 x 500 pixels or smaller. Posts containing over-sized images and signatures will be removed.
  • Illegal content. No re-posting of copyrighted materials or other illegal content is allowed. Any posts containing illegal content or copyrighted materials will be deleted.
Post Reply
BP-APSUKLTD
Posts: 2
Joined: Tue Nov 18, 2025 2:51 pm

Operations view does not include revised/revized costs

Post by BP-APSUKLTD » Mon Dec 08, 2025 2:53 pm

Hi there,

This endpoint always returns a zero value for revised/revized costs: https://COMPANYNAME.simprosuite.com/api ... perations/?

Is there a reason for this? Am I missing something?

Ben
SimproAPITeam
Posts: 831
Joined: Wed May 01, 2024 2:31 am

Re: Operations view does not include revised/revized costs

Post by SimproAPITeam » Mon Dec 08, 2025 11:07 pm

Hi Ben,

When using this endpoint, it is critical that the query parameters are correctly set or else it will default to the most recent objects, leading to unexpected results.

There are also some common pitfalls with this such as:

Job operations without costs: Verify that each job operation has a cost associated with it. If not, this will also return zeros.

Revised costs not calculated: Ensure that revised costs have been calculated for the job operations. This might require running a report or updating the job status in SimPro.

You can find more information about this here: https://developer.simprogroup.com/apido ... 3fd54a2cf6

Please note there is a bug in the documentation caused by our latest release, where the query params are doubling up. We apologise for this inconvenience and are currently working on a fix for this.

Thanks,
Simpro API Team | Simpro Software Group
amy.arkturus
Posts: 16
Joined: Fri May 17, 2024 2:21 am

Re: Operations view does not include revised/revized costs

Post by amy.arkturus » Mon Jul 06, 2026 9:01 pm

Hi,
We're running into the same issues for a few clients where their Simpro native Cost to Complete OperationsTC Operations reports are showing Revised value, but it's returning 0 for all the jobs via the API (any of the revised values).

Can you clarify what you mean calculated by job operations? The client is working as per normal and have been able to see revised values in the CTC report on SImpro. So how can we also see the same numbers via the Operations view by the API? Is there something they need to do in their Simpro? Or soemthing that we can do via API?

Many thanks
Post Reply